DEMOLITION PROCESS
  • Clients’ are required to advice us on anything that remain and not to be removed or demolished prior to the commencement of the demolition
  • Any items that remain and not to be removed must be pack and store properly
  • All debris removed from the project site are transported to the government assigned and allocated areas and paid all require fees for debris dumped.All debris removed from the project site are transported to the government assigned and allocated areas and paid all require fees for debris dumped.
ELECTRICALS & PLUMBING PROCESS
  • All electrical tradesperson carries a valid electrician license issued by the corresponding body
  • All plumbing tradesperson carried a valid plumber license issued by the corresponding body
  • According to the floor plans and clients’ needs to add required power points, light switches, telephone and internet access points.
  • All electrical work are carried out in accordance to the regulation of the Hong Kong Electrical Engineering Board, ie:
    • All electrical cables must comply and support the electrical current for the new power points
    • All new electrical cables must be wired through a PVC conduit
    • All PVC conduit must be inline to avoid any future problems
  • Our plumbers’ will avoid a lot of joints to the copper piping for future leakage and only recommend and uses copper pipes from Australia & UK.
  • There are different brands and styles of toilet suites in the market, ie:
    • Toilet suites comes in high positioned waste, low positioned waste, flexible position waste as well as floor waste.
    • Bath tubs comes in high mounted tub, half skirted tub, fully skirted tub as well as spa tub.
    • Hand basins comes in bench mount bowl/basin, under mount basin and half mount basin
    • Basically there are 2 types of taps, ie: exposed installation or non-exposed installation
ALUMINIUM WINDOW PROCESS
  • To erect new aluminum windows would require scaffold prior to the commencement. All scaffolds will comply to the regulation by the Housing Commissions and the scaffolds provider will require to hold 3rd party insurance and all necessary licence.
  • All scaffolds will require a regular inspection in a 3 week intervals. If any damage found, it should be attended instantly to avoid any accident occurred.
  • After installing the new aluminum windows, it is required to fill all the gaps with cement and waterproof materials to avoid any future leakage from sunlight and rain damages. This will all be carried our by the license trades people whom specialized in aluminum window.
AIR CONDITIONER PROCESS
  • Window type A/C must be installed by licensed A/C trades person and must be supported with frame to hold the unit.
  • Excess water produce from the A/C unit must be connected to the main drainage of the building.
  • All compressor unit for the split system A/C must be supported by the steel frame and securely fastened to the walls by dyna bolts
  • Build-in excess water waste line must align with a down flow for drainage to avoid any leakage in the future.
CARPENTRY PROCESS
  • There are different types of the timbers in the market, ie: ply wood, MDF, solid timber, etc. This will reflect the different price and cost of the product. In terms of finishes we will be able to choose from different types of paint grades, ie: satin, semi gloss, high gloss, piano finish or maybe different timber finishes. This will varied to the final cost base on your taste buds.
  • We recommend hardwood door frame to be used throughout the property and hardwood front door since it is hard wearing and stronger. We could use ply-wood door for internal room door.
  • Clients’ should provide us with all the details including the measurements and brand and models for all electrical appliances in the kitchen including sink and benchtop materials
  • Carpenters will work on site base on the measurements on the plans and if any variations found, the carpenter will approach the designer and project manager to discuss and resolve the query.
  • Carpenters will carry all required tools for the project and all tools comply with safety standard.
  • Prior to final installation of every piece of furniture, the carpenter will make a final chalk line for accuracy.
PLASTER & PAINTING PROCESS
  • Unless otherwise stated by the clients’, the painter will scrape all old paint and use oil base plaster to smooth the surface. This will allow the surface to reach a silky smooth finish.
  • If necessary, we will apply a plastic corner to apply the wallpaper to produce a smoother finishes.
  • We will affix a paper tape in between the old and new wall paper to reduce the chance of peeling off.
  • The standard of finishes to the surfaces is not to apply how many coats of plaster and paint. Our standard to obtain smooth surface is to apply plaster and sanding off and re-apply until we acknowledge a smooth surface. Then we will paint the surface and reaches the same standards.
CLEANING & MAINTENANCE PROCESS
  • After the whole renovation/ refurbishment, we will carry out a basic cleanout of the property our client.
  • Upon completion of the project, we will provide a 1 year limited warranty to the project.