傢俬訂造 地板打蠟 傢俬組裝 浴室裝修 水喉水務工程 水龍頭和管道維修 廁所水箱維修 商舖室內設計和裝修 餐廳室內設計和裝修 室內裝修設計 砌磚鋪板工程 維修 更換 安裝門工程 燈飾工程 戶外工程 電力工程 油漆工程 家居裝修 室內設計 局部裝修 辦公室室內設計和裝修 傢私工程 地板工程 清拆或還原工程 水泥工程    Get Quote Now
Detail

  Material included Material excluded
01. Demolish and removal of existing flooring, skirting and apply plaster base.    
02. Apply the new .    
03. Polish lacquer wooden flooring about .    
04. Demolish and removal of existing entrance door and install new plywood door .    
05. Install new internal hollow door set .    
06. Repair existing door set and door frame set, using .    
07. Repair all striking, using .    
08. Apply plaster base followed by .    
09.  install new window sill and touch up, standard window sill set, outsize set .    
10. Kitchen, bathroom and entrance new build marble sill set.    
11.  install fluorescent tube light beam.    
12. Entrance new build .    
13. Corridor new build .    
14. Corridor new build , using painting.    
15. Demolish and remove walls..    
16. Demolish and remove .    
17.  install new aluminum mosquito net.    
18. New build .    
19. Install new stainless steel gate in entrance.    
  Material included Material excluded
20. Demolish and remove existing wall and cement sand, install .    
21. Demolish and remove existing floor and install .    
22. Splash back panel install stainless steel.    
23. New build Bar counter top , using .    
24. New build Bar hang units , using .    
25. Install and install lighting.    
26. Remove existing painting and apply plaster base in ceiling.    
  Material included Material excluded
27. Demolish and remove existing wall finishing and cement sand, install .    
28. Demolish and remove existing floor and install .    
29. Demolish and remove the existing basin unit and a new build worktop, basin unit using .    
30. A new build .    
31.  install .    
32. Demolish and remove bathtub and install new .    
33. Remove and install a new water closet.    
34. Install and install lighting .    
35. Remove existing paint and apply plaster base and Emulsion Paint in the ceiling.    
  Material included Material excluded
36. Demolish and remove the existing wall tiles with cement sand base, install .    
37. Demolish and remove existing floor tiles and install .    
38. Demolish and remove the existing basin unit and a new build worktop, basin unit using .    
39. A new build .    
40.  install .    
41. Demolish and remove bathtub and install new .    
42. Remove and install a new water closet.    
43. Install and install lighting.    
44. Remove existing paint and apply plaster base and Emulsion Paint in the ceiling.    
  Material included Material excluded
45. Demolish and remove the existing wall tiles with cement sand base, install .    
46. Demolish and remove existing floor tiles and install .    
47.  install .    
48. Remove and install a new water closet.    
49. Demolish and remove existing basin unit and install a new .    
50. Install and install lighting.    
51. Remove existing paint and apply plaster base and Emulsion Paint in the ceiling.    
  Material included Material excluded
52. Demolish and remove wall finishing and cement sand base, install in balcony.    
53. Demolish and remove existing flooring and install in balcony.    
54. Demolish and remove existing handrail and new build in balcony.    
55. Demolish and remove existing door with frame and install new .    
56. A new build awning set.    
  Material included Material excluded
57. Install new copper with PVC surface water pipe to .    
58. Install a new electric meter box .    
59. A new build 13A socket and switch .    
  Material included Material excluded
60. Entrance a new build .    
61. New build TV units in living area.    
62. New build display cabinet in living area.    
63. New build shoes cabinet in living area.    
64. New build pray cabinet in living area.    
65. New build display cabinet in dinning area.    
66. New build shoes cabinet in dinning area.    
67. New build pray cabinet in dinning area.    
68. New build set desk in study room.    
69. New build wardrobe set in study room.    
70.  A new build desk in .    
71. Study room new build desk on window sill set.    
72. Study room new build bed with gas spring fitting set.    
73. New build desk set in bedroom.    
74. New build wardrobe set in bedroom.    
75. New build desk in bedroom.    
76. New build desk on window sill set in bedroom.    
77. New build bed set in bedroom.    
78. Master bedroom new build desk set.    
79. New build wardrobe set in master bedroom.    
80. Master bedroom a new build desk set.    
81. Master bedroom a new build desk on window sill set.    
82. Master bedroom a new build dressing table set.    
83. Master bedroom a new build bed set.    
  Material included Material excluded
84. Remove existing paint and apply plaster base and using in the stairwells.    
85. Demolish and remove existing handrail and install new .    
86. Apply new .    
  Material included Material excluded
87. Demolish and remove wall finishing and apply cement sand base and install on the roof.    
88. Demolish and remove existing flooring and apply .    
89. Demolish and remove existing handrail and install new .    
90. A new build green house on the roof ft2.    
  Material included Material excluded
91. A new build garden wall and apply cement sand base and install .    
92. Demolish and remove existing flooring and apply .    
93. Demolish and remove existing balustrade and install new .    
94. A new build green house in the garden ft2.    
• thanks you very much, visiting our online quotation. simply ( ) the box and send us the floor plan, we reply within 3 work day.
• If you have any question, please contact us.
• Our campany will provide estimate quotation.
• There will be 10-20% differcent to actural quotation, all measurement should be verified insite.
Validation code:
Refresh

Copyright © 2013 DREAM INTERIOR DESIGN DECORATION LTD.

Dream Interior Design